Here is another of our signal videos.
This one is about monitoring power use at a facility.
Most times putting a CT or current transformer around the mains power lead coming into a building is too expensive or disruptive, so getting the power company to fit pulsing outputs is usually quick and easy.
Granted, you are not likely to see this at a house (Gary would be exception, his place fairly glows with energy 24*7), but I’m sharing because my job is so weird that you need to see something about what I do all day.
The amount of work that goes into these 6ish minutes is astounding.
The script gets about 20 or so revisions as we refine it and take out extra words…. We also have to tweak the script to make sure it flows over the whole video and that each section meshes in with the whole video.
The whole thing is so complicated that I have to use a teleprompter to read the script. We use an iPad and one way mirror to reflect the words in front of the camera.
I have a foot operated button on the floor to pause and play the script as I am reading it. (I have it set to play faster than I can read, that way I can pause and change the pace of what I am saying without having to wait for the script to catch up with me).